SOLICITATION DETAILS
Solicitation Details
Type: | Invitation For Bids (IFB) |
---|---|
Status: | Closed |
Solicitation Number: | IFB 6100 CLMC1065 |
Description: | Hyde Park (E 38th St/Grooms St/Avenue F) WW Pipeline Renewal |
Summary: | Replacement of approximately 1750 LF of 8-inch WW Main and 46 LF of 6-inch services on several streets including East 38th St (Grooms to Tom Green), Grooms St. (E 35th to e 38th), Griffith St (E 37 to E 38th) and two alleys. This infrastructure has been identified through CCTV inspection and selected for replacement based upon the following factors: physical condition of main, number of sanitary sewer overflows (SSOs), estimated volume of wastewater discharged during the SSOs, and amount of inflow and infiltration. Inflow and infiltration are the estimated amount of groundwater or rainwater leaking into a wastewater main. |
Estimated Amount for Solicitation: | $1,351,319.00 |
Vendor Name | Doing Business As | File Name |
---|---|---|
Cedar Hills Construction LLC | Price Offer Document | |
DENUCCI CONSTRUCTORS L L C | Price Offer Document | |
FACILITIES REHABILITATION INC | Price Offer Document | |
Packsaddle Management LLC | Packsaddle Management | Price Offer Document |
Underground Water Solutions Co. | Price Offer Document |
Subcontracting Goals
African American | 1.21% |
---|---|
Hispanic American | 6.65% |
Native/Asian American | 0.18% |
WBE | 0.30% |
Contact Information
Authorized Contact Names: | |
---|---|
Project Related Questions: |
Patricia Tilley (512) 974-3014 patty.tilley@austintexas.gov |
Solicitation Specific Questions: |
Jeremiah Johnson (512) 974-3049 jeremiah.johnson@austintexas.gov |
Small Minority Business Resources Questions: |
John Wesley Smith (512) 974-7758 smbrcompliancedocuments@austintexas.gov |
Dates & Times
Important Solicitation Dates: | |
---|---|
Solicitation Published: | 09/02/2024 07:20 AM |
Response Due: | Prior to 10/17/2024, 02:00 PM |
Compliance Plan Due: | Prior to 10/17/2024 02:00 PM Required |
Response Opening: | 10/17/2024, 03:00 PM |
Vendor Meetings/Conference, Site Visits (Date/Time): | |
---|---|
Meeting: | 09/11/2024, 01:00 PM |
Special Notes
Special Notes: |
Compliance Plan Required. |
---|
Packet Download Files
BIDDERS / PROPOSERS:
Listed below are the various documents that have been issued as part of this Solicitation. Each document contains specific information about the solicitation. We recommend that you view and/or download each document before preparing your response to the solicitation, and that you use the bid subscription link to record your interest in this solicitation.
File Description | Type | Date | |
---|---|---|---|
Pencil Bid Tabulations | 10/31/2024 | Download | |
pen | 10/17/2024 | Download | |
Addendum - 2 | 10/08/2024 | Download | |
Addendum - 1 | 09/25/2024 | Download | |
Pre-Bid Attendance List | 09/11/2024 | Download | |
Bid Documents Vol 1 of 2 | 09/02/2024 | Download | |
Bid Documents Vol 2 of 2 | 09/02/2024 | Download | |
Plans/Drawings | 09/02/2024 | Download |
Associated Commodities
Description | Code |
---|---|
Paving/Resurfacing, Highway and Road | 91395 |
Trade Summary
Description | Category | Code |
---|---|---|
Construction, Sewer And Storm Drain | Construction | 91345 |
Relay Construction Services (Includes Wiring, Testing, Comm | Construction | 9135660 |
Construction, Water System, Main And Service Line | Construction | 91360 |
Paving/Resurfacing, Highway And Road | Construction | 91395 |
Traffic Control Device Placement And Removal Service | Non-professional | 96884 |
Erosion Control Services | Non-professional | 98814 |
Fence Installation And Repair | Non-professional | 98815 |